|
|
|||||||
Services > Community DevelopmentGazebo Construction
VILLAGE POLICY ON CONSTRUCTING A GAZEBOA permit application must be filled out with a Plat of Survey attached showing the location and size of the Gazebo. It will be reviewed before issuing the permit. The 2003 International Residential Code and (if applicable) the 2002 National Electric Code will be followed. LOCATION/FEES: Gazebo must be a minimum of
ten (10) feet from rear of the house and six (6) feet away from
side and rear property line. REQUIRED INSPECTIONS The pier or post holes must be
inspected before they are filled to assure the 42"
minimum depth. Call (847) 459-2620 twenty four (24) hours in advance for scheduling all inspections. If you belong to a Homeowners Association, a letter of permission for installation is required by the Village if required by the Association. Fees Revised 1/1/11; Revised 1/1/08
|
|
||||||