Services > Community DevelopmentDemolition Permit RequirementsThe following information must be submitted to the Community Development Department before a demolition permit can be issued: 1) Letter of authorization from the owner. 2) Up to date plat of survey - indicating building(s) to be demolished, location of any wells, septic tanks or cisterns. 3) A list of all people/firms connected with the demolition with their addresses and telephone numbers. This includes the general contractor, well sealer, septic pumper/hauler, etc. 4) A performance bond or other performance surety acceptable by the Village Attorney in the amount of 150% of the demolition contract for Village owned properties. 5) A copy of a Certificate of Insurance in the amount of: $300,000.00 - property damage, and $500,000.00 - personal injury (note the dollar amount changes for buildings over two stories). 6) A list of work the demolisher is to do. 7) The Cook County Department of Environmental Control (312-603-8200) Chicago, Illinois requires you apply for a demolition permit from their agency (application is attached). 8) *Affidavit that all utilities, i.e. gas, electric, phone, water and sewer have been abandoned/removed. Northern Illinois Gas (800) 730-6114 (48 hour notice) Commonwealth Edison - (800)-334-7661 (48-72 hour notice) Water/Sewer - Wheeling Public Works (847) 229-4600 (24 hour notice) see attached sheet. Water meter removal - Wheeling Public Works (847) 229-4600 (24 hour notice) see below. (*) IT IS THE RESPONSIBILITY OF THE DEMO CONTRACTOR TO CONTACT J.U.L.I.E. (1-800-892-0123) FOR UTILITIY LOCATES AS WELL AS LOCAL PHONE, CABLE PROVIDER'S ETC. TO ENSURE PROPER DISCONNECTS HAVE BEEN COMPLETED. 9) A field inspection report by the Village Health Officials verifying proper abandonment and/or sealing of private water and sewer systems must be on file. 10) A completed Building Permit Application must be included with the above items. AFFIDAVIT OF COMPLETION MUST BE ON FILE BEFORE DEMOLITION PERMIT CAN BE ISSUED. DEMOLITION NOTIFICATION PROCEDURES FOR PUBLIC WORKS1. Public Works requires no less than 48 hours notice
prior to demolition so that water services can be shut off
at the Buffalo-box, and the meter can be removed and
secured. Some additional points of concern: 1. Regarding any language referencing where services
are to be disconnected, we would like the phrase "at
the point of connection to the Village main line"
used to properly pinpoint the exact location of
separation.
|
|
||||||